1 result found

Christopher Wylie

Job title: Regional Managing Director - Middle East

Telephone: +971 4 358 3963

Mobile: +971 (0)55 491 3025

Location: Dubai

Expertise: Commercial Property, Business Interruption, Construction/erection all risk, delay in start-up, Professional Indemnity, Public & Products Liability, Financial Lines, Specie & Jewellers Block, Fine Art, Risk Surveying

Specialities: Property & Casualty, Professional Indemnity, Business Interruption, Construction & Operating Risks, Fine Art & Specie

About:

Christopher is a Chartered Loss Adjuster who has worked in the insurance industry for more than twenty-three years to include twenty years as a Loss Adjuster.
Before joining CTA as …

Christopher is a Chartered Loss Adjuster who has worked in the insurance industry for more than twenty-three years to include twenty years as a Loss Adjuster.
Before joining CTA as General Manager of our Qatar operation, he had worked in the Middle East for more than seven years dealing with a wide range of major and complex losses across multiple lines of insurance. He also carried out risk surveys for various industrial and commercial risks.
He has carried out assignments in the UK, Qatar, UAE, KSA, Oman, Bahrain, Kuwait, Jordan and Lebanon.

Professional  Qualifications

  • Associate of the Chartered Institute of Loss Adjusters (ACILA)
  • Associate of the Chartered Institute of Arbitrators (ACIArb)
  • Technical Specialist of the Institute of Risk Management (SIRM)
  • Fellow of the International Federation of Adjusting Associations (FIFAA)


Notable Assignments 

  • Flooding and rain damage to commercial property – USD 35m
  • Inundation of contract works – light rail project – USD 45m
  • Inundation of contract works – pipelines and infrastructure – USD 12m
  • Storm damage to hotel – material damage and Business Interruption – USD 3m
  • Professional Indemnity – inundation of contract works by ground water during drilling – USD 20m
  • Professional Indemnity – defective design of road – USD 3m
  • Flooding of hotel – material damage and Business Interruption – USD 10m
  • Fire damage to Hotel – material damage Business Interruption – USD 5m
  • Flooding of convention centre – material damage Business Interruption – USD 20m
  • Flooding of manufacturing facility – commercial property, plant machinery – USD 15m
  • Inundation of contract works – infrastructure project – USD 12m Fire damage to shopping mall – commercial property Business Interruption – USD 10m
  • Failure of reservoir structure – USD 20m
  • Fire damage to warehouse logistics hub – USD 10m
  • Defective design of foundation to fuel tanks – USD 10m Collapse of Crane and damage to third party property – USD 3m
  • Risk Survey of metro system / Sports Complex / Hotels / Manufacturing Facilities / Jewellery Diamond Retailers Wholesalers / Art Galleries
Read more >