Cookies on this site

This site uses cookies to store information on your computer. By using our site you accept the terms of our Privacy and Cookie Policy

Accept and close
 
Menu
Map Base
Where we are
 

Vince Teh

Vince Teh

General Manager - Engineering, Charles Taylor Adjusting

Telephone +603 2246 6078
Mobile+612 744 0253
Email Vince.Teh@charlestaylor.com
Address

Level 8, Tower 8, Avenue 5,
The Horizon Phase 2, Bangsar South,
No 8, Jalan Kerinchi,
59200 Kuala Lumpur, Malaysia

Expertise

Policy types: CAR/EAR, Property, Energy; Complex construction including buildings, highways and railway infrastructure, industrial plants, tunnels; power generation and petrochemical

About This Individual
  • A Civil Engineer by practice, Vince is also a Fellow of the Australian Institute of Chartered Loss Adjusters (FCLA)
  • Graduated from the university of British Columbia (Canada), Vince worked as a Civil Design Engineer in T.Y.LIN SEA Pte Ltd in Singapore before relocating to Hong Kong/China as an Assistant General Manager for a production plant involving electronics and electrical appliances.
  • In 2006, Vince completed his MBA studies from the University of Hong Kong before returning to Malaysia.
  • Vince has now 15 years of loss adjusting experience specializing in Construction and Engineering losses.

Professional Qualifications

  • MBA, BASc (Civil Eng), FCLA
  • ANZIF (Sne Assoc), CIP, Dip FS

Languages

  • English
  • Bahasa Malaysia
  • Mandarin /Cantonese

Notable Assignments

  • Explosion claim involving a refinery in Malaysia (IAR loss over USD130 million)
    Mechanical Breakdown claim involving a petrochemical plant in Malaysia (IAR including BI loss over RM65 million)
  • Various fire to high rise building construction site claim (between RM5 to RM25 million)
  • Various landslide/slope failure claims for existing highway and highway construction projects (between RM5 to RM40 million)
  • Various structural failure claims for high rise and highway construction projects (between RM1 to RM50 million)
  • Various types of claims including rolling stocks, tunnels, civil & structural and liability claims involving mass rapid transport system
  • Various Professional Indemnity claims involving engineering consultants and architects (between RM1 to RM10 million)
  • Catastrophic losses involving Cyclone Gonu in Oman; flood losses in Thailan